![]() "We are deeply frustrated by the slow pace of construction by the contractor and the multiple delays in the construction of the suicide barrier," said district spokesman Paolo Cosulich-Schwartz. SDJV claims the project will cost "more than" $398 million, not the $142 million the district wants to pay. "Instead of acknowledging its own mistakes, the District seeks to take SDJV hostage and have it complete the job without adjusting the price." "It later became apparent that many of the District's own designs and design criteria and specifications are flawed, and some requirements would be impossible to execute," the court filing reads. The bridge district is accused of "withholding significant information" during the proposal phase of the project, including "extensive deterioration of the bridge" that interfered with SDJV's ability to perform the work. In a motion in that case filed this week, SDJV also sought the court's permission to sue the Golden Gate Bridge, Highway and Transportation District, which manages the bridge. ![]() Shimmick and Danny's countersued this year. ?SDJV? over allegations that they were owed at least $13 million. Last year, project subcontractor Vigor Works LLC sued joint venture contractors Shimmick Construction Co. The project to erect stainless steel mesh netting on both sides of the bridge was supposed to be finished last year but has been plagued with delays. The support arms for the suicide deterrent network at the Golden Gate are shown in a 2021 photo (Courtesy Golden Gate Bridge Highway and Transportation District)Ĭompletion of a suicide prevention net on the Golden Gate Bridge could be further delayed after construction companies contracted to take on the project claim their costs have more than doubled, according to documents filed this week in San Francisco Superior Court.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |